Bartow
Watch a 1 million pound converter being moved in a 3-month timelapse, compressed into 60 seconds.
Bartow
1 Million Pound Steel Sulfuric Converter Relocation
Gulf Coast Industrial successfully relocated a prefabricated stainless steel sulfuric converter weighing one million pounds to its new location, 80 feet away. We then routed all the ducting of the converter system. The sulfuric converter tower contains the catalyst that stimulates the chemical conversion of gases for the production of sulfuric acid.
Job Stats
47 days, 20,000-hour incident and injury-free work hours
Gulf Coast Industrial moved a 1 million pound prefabricated stainless steel converter 80 feet to its new location
Routed all the ducting of the converter system
Apollo Beach
Explore a massive 600,000-pound ship loader in just three months, captured in a breathtaking time-lapse condensed to just 60 seconds.
Apollo Beach
Emergency 600,000 Pound Ship Repair and Relocation
An emergency call was placed due to a mechanical issue with the ship loader. The boom cable snapped, causing the boom’s weight to slide backward, hitting the main unit, tearing the rails out of the ground, and derailing the loader. The Gulf Coast Industrial team was assigned to fix the loader, the boom cables, and the rail tracks and relocate the unit.
Job Stats
9000 work hours completed incident- and injury-free
Jacked the ship loader, installed temporary rails
Put derailed 600,000 pounds ship loader back on the track
Repair metal support structure, loader support systems and replace boom cabling
Lifted equipment to make repairs and replace structural steel
Removed temporary systems to achieve full operational status
Moore Haven
Follow the Gulf Coast Industrial team as they complete a 3-month hopper installation project in this exciting 60-second timelapse.
Moore Haven
Internal Building Installation
Gulf Coast Industrial successfully installed internal building for new fertilizer blending facility. This included all structures, access, and major equipment.
Job Stats
Over 9200 work hours completed incident- and injury-free
Included over 100 separate pieces of operational equipment.